
Add to Cart
Ssch20 API 5L PSL1 X56 ASTM A53 Hot Finished Welded Tubes
Welded Pipe and Tube Market
Welded pipe market drivers are varied by regions. Large and medium welded pipes demand is mainly driven by major pipeline projects. Most pipeline projects have a close relationship with hydrocarbon exploration activities.
Hydrocarbon fuel demand and fuel prices are keys to the demand for welded pipes. In additions, urbanisation is also playing a key role in driving the demand which supports infrastructure for water and sewerage lines, using welded pipes. Other factors which drive welded pipes demand include GDP growth, construction, automotive and chemical industries.
Developments in the Welded Pipe Industry
North-East Asia, North America and Europe show stable demand growth in pipeline developments over the next five years. China announced in 2017 to increase its existing 112,000 km of energy pipelines network to 169,000 km by 2020 and up to 240,000 km by 2025. Japan has been planning to build a 1,500 km pipeline to import gas from Russia.
North America accounts for almost 31,000 miles of planned pipelines out of which 15,279 miles were already under construction as of 2017. One of the ongoing projects in the US is the construction of 600 miles Atlantic Coast pipeline. Nord Stream 2 project is also expected to be completed by 2021. The Middle East and Africa have 4,423 miles of pipeline projects under construction as of 2018, while 4,794 miles of pipeline projects are planned for the future.
Item | Details |
Type | Seamless,ERW,LSAW,SSAW |
Standard | ASTM A106.ASME SA106,API 5L ,ASTM A53 ,ASME SA53 |
Grade | B,X42,X46,X52,X56,X60,X65 |
OD | 17.1-1422mm (3/8inch-56inch) |
WT | 1.5-100mm (Ssch20,sch30,STD,Sch40,Sch80,XS,XXS,Sch100,sch120,etc) |
Length | 1-12.9m random length,or Fixed length( 5.8m,5.85m,6m.11.8m.12m) |
Min.Order quantity | We can accept 1 pcs/size if we have stock. |
Surface | 3PE,3PP,FBE,Black painting,Clear oil varnish.or self color,Inorganic zinc rich layer |
Ends | Plain ends,Bevels. |
Payment term | TT or LC |
Package | Bundles or loose |
Delivery time | Depends on the specific orders,normally 45days |
|